A6 Corridor in Stockport - Improving Journeys

Closed 24 Mar 2024

Opened 26 Feb 2024

Feedback updated 16 Dec 2024

We asked

Stockport Council is consulting on improving journeys on the A6 corridor from the Manchester Boundary to Stockport Town Centre.

Working in partnership with Transport for Greater Manchester (TfGM), we want to make the roads safer, reduce bus journey times, improve access to bus stops, provide better crossings, and develop cycle routes parallel and across the A6 to make it easier to walk, wheel and cycle.

You said

  • Proposals could increase pollution and congerstion
  • May descrease the safety of cyclists
  • Against Drop Crossings and would prefer Dutch Kerbs
  • Against the proposed One-Way on Buckingham Road
  • Incorporate more green spaces
  • Warwick Road bridge may become too narrow
  • Speed of vehicles needs to be reduced / controlled
  • Not ambitious enough
  • Not enough cyclists to justify the improvements
  • Against limiting access to Ellesmere Road North
  • Signalised crossings need shorter waiting times for pedestrians
  • Not enough improvements for cyclists
  • Implementation of cyclops junctions
  • Against the loss of trees
  • Roads need to be made safer for cyclists
  • Halesden Road & Ash Grove footway should be converted into a shared footway / cycleway
  • Against narrowing of Whitehill Street at the junction of Manchester Road as this will make it difficult for HGVs turning at the junction towards the industrial estate
  • Concerned with the potential loss of parking as this may reduce footfall for businesses, impacting the viability of traders particularly around Heaton Chapel village centre
  • One-Way systems are too confusing to be user-friendly
  • Against road closures and concerns with additional traffic on Broadstone Hall Road North
  • The proposed route along Manchester Road is too complicated and does not have enough space for segregated cycling facilities
  • Eastern cycle route may be too indirect
  • Western cycle route is too indirect
  • Cyclists should have priority on the roundabout
  • Warwick Road bridge should be made One-Way to allow for footway improvements
  • Concerned for the safety of cyclists
  • Speeding traffic needs to be controlled / slowed
  • Priority at Parsonage Road junction with Heaton Road should be reverted to an older layout
  • The bus stop relocation on Heaton Road junction with Ashburn road can cause a few blind spots for drivers driving on Parsonage Road and vice versa south to Heaton Road junction with Parsonage Road
  • Signage warning of cyclists is required on bridges
  •  Against signalised junction on Heaton Road / Ashburn road / Alexandra Road
  • Pavement parking needs to be stopped
  • Proposals are prioritising cyclists over motorists
  • Requested 20mph be implemented on Mauldeth Road
  • Requested a 24hr bus lane
  • Against shared pedestrian / cyclist spaces
  • Bus lanes should not be extended
  • A6 should be made more pedestrian / cyclist friendly
  • Cyclists may not use the proposed cycle routes
  • All roads leading off the A6 should be One-Way
  • Against the loss of potential parking
  •  Glenfield Road Traffic signals are unnecessary
  • Against cyclists being encouraged to use Leegate Road
  • Requested maintenance on Leegate Road
  • Agaisnt raised junction tables
  • Opening up the gateway between the adopted and unadopted parts of Leegate Road could allow access for motorcyclists
  • Western cycle route should go through Heaton Moor Golf Course
  • Against a cycle route along St James Road
  • The contra-flow cycle lane needs physical segregation
  • Against changing the priority of traffic on Broomfield Road / Warwick Road
  • Concerned about the safety of the public in shared spaces
  • Against the crossing on Heaton Moor Road / Peel Moat Road / Broomfield Road
  • Requested no access to motor traffic on Warwick Road
  • No need for a cycle route down Heaton Road as no-one cycles that way
  • Requested double yellow lines near the greenspace at Heaton Road / Parsonage Road junction
  • Requested segregated cycle lanes running down the A6

We did

You Said (Reworded)

We Did

You said these proposals could Increase pollution and congestion.

We have ensured that these proposals aim to encourage more walking, cycling and use of public transport to help reduce car use, to reduce congestion and to lower pollution. The scheme includes junction improvements to benefit all road users. Traffic modelling and analysis have been undertaken at various locations and the results indicate the proposed junction improvements operate within capacity although some operational delays may increase due to the need for vehicles to wait during pedestrian stages where these are not currently present. It is not anticipated that the proposals will increase congestion and they should not have any significant impact on traffic flows.

You said these proposals may decrease the safety of cyclists.

We have increased the safety of cyclists as, the existing cycle lanes on the A6 are signed as being Monday to Friday 7-10 am and 4-7 pm only and do not comply with guidance in LTN 1/20. Where we have removed them, we have replaced them with bus lanes which cyclists can use and which are designed to a width that will require the bus to leave the bus lane to overtake a cyclist.

 

We have ensured that these proposals include significant investment in the improvement of quiet on-carriageway cycle routes in residential areas and the installation of a number of controlled crossings along busier routes.

You said you are against Vehicle Drop Crossings and would prefer Dutch Kerbs.

We will take into account the preference for Dutch style kerbs while considering acceptable crossfall on footways, existing conditions and the need to maintain access to premises. Ultimately, the layout and kerb types for vehicle drop-crossing arrangements will be determined as part of the detail design.

You said you’re against the proposed one-way on Buckingham Road.

We have omitted Buckingham Rd One-Way from the scheme.

You said that proposals should incorporate more green spaces.

We have, where space allows, provided some additional green spaces. In addition, tree planting has been provided in several other locations. There are also a number of new benches located throughout the scheme extents. Unfortunately, much of the proposed cycle routes are along existing highways where space is limited.

You said the Warwick Road bridge may become too narrow.

We have checked the proposals for vehicle manoeuvrability (vehicle tracking) which are also subject to a Road Safety Audit to check that there is adequate space for vehicle movements in both directions. Further, weight restrictions will restrict the types of vehicles permitted to use the bridge.

You said the speed of vehicles needs to be reduced/controlled.

We are proposing to implement several different measures to help reduce the speed of vehicles, these include traffic calming such as speed humps, raised junction tables and the reduction of corner kerb radii. 20mph speed limits have also been proposed for many residential streets to reduce the speed of vehicles and improve safety for vulnerable road users. These speed limits are proposed to complement the existing and other approved 20mph speed limits within the scheme extents.

You said the proposals are not ambitious enough.

We have, within the available budget and timescale for delivery, made the proposals as ambitious as possible. It will provide new bus lanes, improved junctions, enhanced crossings and upgraded bus stops along the A6 corridor. This is in addition to eastern and western cycle routes connecting the Heatons and Reddish areas to the Town Centre, providing improved pedestrian facilities and off-carriageway and quiet on-carriageway cycling provision.

You said there are not enough cyclists to justify improvements.

We have proposed cycle routes that would use the existing network along with a combination of off-road paths and quiet roads which are already linked to the wider cycle network. The aim is to help encourage people to become more active and make fewer car journeys to reduce traffic congestion and air pollution and to help tackle climate change. Part of this is to make journeys on foot or by bike much easier and more attractive for residents. Consequently, an increased number of cyclists is anticipated.

You said you are against limiting access to Ellesmere Road North.

There are no proposals to limit access to Ellesmere Road North.

You said that signalised crossings need shorter waiting times for pedestrians.

We will take this preference into account although call times for crossings will be considered by the UTC during the detailed design stages.

You said there are not enough improvements for cyclists.

We have proposed two cycling routes to the east and west of the A6 connecting the Heatons and Reddish areas to the Town Centre. There are also improved cycling facilities at a number of junctions on the A6 corridor, providing connections to key locations to the east and west. These proposals include segregated cycleways, shared use facilities, quiet on-carriageway cycle routes and a variety of controlled crossings for cyclists.

You requested for the implementation of cyclops junctions.

We did an in-depth analysis of the possible implementation of Cyclops junctions. Unfortunately, cyclops junctions cannot currently be delivered as part of the Bus Radial (A6 Corridor – Improving Journeys) scheme because either 3rd party land would be required at the junctions, or the junctions would need to be re-designed with considerably reduced capacity.  Unfortunately, the legal and land requirements to provide segregated cycle lanes and ‘CYCLOPS’ type junctions on the A6 would take the project well beyond the March 2027 deadline to build it and would cost a lot more than the money allocated for it.

You said you are against the loss of trees.

We have minimised the loss of trees as much as possible, although the proposals do require some trees to be removed.

The trees along the PROW 162S Bowerfold Lane – Higher Bury Street have been surveyed and assessed and the report indicates that 9 trees can be removed due to poor condition, and another to enable path construction. The trees to be removed are from an overgrown hedge that has not been maintained and the trees are showing signs of decay with potential structural problems. The trees to be removed will be replaced with more suitable species along with a mature native hedge. The 9 trees to be removed from Leegate Road are self-seeded trees which have established themselves on a mound which needs to be removed to enable the construction of a cycle path.  Replacement tree planting will be provided.

You said roads need to be made safer for cyclists.

We have proposed two cycling routes as alternative options to the A6. These routes include traffic calming measures, 20mph speed limits, controlled crossings, shared use facilities and segregated cycleways, which will increase the safety of vulnerable road users.

You said Halesden Road & Ash Grove footway should not be converted to a shared footway/cycleway.

To provide onward connections from the proposed Toucan crossing at Lambs Fold (which provides a link between the eastern cycle route and the A6) it is required that a shared space footway/cycleway on either side be implemented. This will require a short length of footway / cycleway between the junction of Manchester Road / Halesden Rd and the crossing but for the most part, the footway on Halesden Rd will be for pedestrian use only.  We have also omitted the proposed shared space footway/cycleway between Orthes Grove and Ash Grove from the scheme.  On Ash Grove, a new cycleway will be built on what is currently a verge, not a footway.

You said you’re against narrowing of Whitehill Street West at the junction with Manchester Road as this will make it difficult for HGVs turning at the junction heading towards the industrial estate.

We have checked the proposals for vehicle manoeuvrability (vehicle tracking). to confirm that there is adequate space for all vehicle movements at the junction.

You said you’re concerned with the potential loss of parking as this may reduce footfall for local businesses, impacting the viability of traders, particularly around the area of Heaton Chapel village centre.

We have consulted with Local businesses and parking surveys have been undertaken. Comments and results have informed the design. At the Manchester Road / A6 junction a parking bay has had to be removed to provide an additional pedestrian crossing with provision of a loading bay to facilitate servicing of the shops. 

You said you believe that one-way systems are too confusing to be user-friendly.

We have omitted all one-way proposals.

You said you’re against road closures and concerns with additional traffic on Broadstone Hall Road North.

We have omitted the road closure on Carnforth Road from the scheme.

You said the proposed route along Manchester Road is too complicated and does not have enough space for segregated cycling facilities.

This scheme will provide a valuable off-carriageway cycle link connecting quiet streets in Heaton Chapel with those in South Reddish with onward connection via quiet streets to the Town Centre.  We will implement wayfinding signage to prevent confusion to those using the cycle route.

We have used an accurate topographic survey when designing the cycle routes, ensuring there is adequate space for the proposals.

 

You said that the Eastern cycle route may be too indirect.

We have proposed the parallel cycle routes to offer alternative routes between residential areas of the Heatons and the Town Centre. They provide a north-south link and connections to local schools, residential areas, and other local amenities. From the Northern end of the Eastern cycle route at Nelstrop Rd to the Southern end at Tiviot Dale, the route distance is approx. 3.3km.  Between these two locations the distance is similar via the A6. 

You said the western cycle route is too indirect.

We have proposed the parallel cycle routes to offer alternative routes between residential areas of the Heatons and the Town Centre. They provide a north-south link and connections to local schools, residential areas, and other local amenities. From the Northern end of the route at the junction of Buckingham Road / Peel Moat Road the distance to Mersey Square is similar (2.9km) via the Western cycle route or via the A6.

You said cyclists should have priority on the roundabout.

We have revised the drawings to show both Tiger crossings and Sparrow crossings. Cyclists and pedestrians have priority on Tiger crossings. At Sparrow crossings, the cyclist detection equipment can be used to detect and change signals for approaching cyclists.

You said Warwick Road bridge should be made one way to allow for footway improvements.

We have checked the proposals for vehicle manoeuvrability (vehicle tracking) which are also subject to a Road Safety Audit to check that there is adequate space for vehicle movements in both directions. Further, weight restrictions will restrict the types of vehicles permitted to use the bridge.

You said you are concerned for the safety of cyclists.

The proposals include extensive measures to make cycling safer including lower speed limits on residential streets, traffic calming, off carriageway cycle facilities and a number of new crossings. We will also subject the proposals to a road safety audit.

You said speeding traffic needs to be controlled / slowed.

We have proposed several different measures to help reduce the speed of vehicles. These include traffic calming such as speed humps, raised junction tables and the reduction of corner kerb radii. 20mph speed limits have also been proposed for many residential streets to reduce the speed of vehicles and improve safety for vulnerable road users. These speed limits are proposed to complement the existing and other approved 20mph speed limits within the scheme extents.

You said priority at the Parsonage Road junction with Heaton Road should be reverted to older layout.

We have revised the scheme to include a raised junction table to help reduce the speed of vehicles on the approach to the junction and make the need for vehicles exiting Parsonage Road to give way clearer.

You said the bus stop relocation at Heaton Road junction with Ashburn Road can cause blind spots for drivers driving on Parsonage Road and vice versa south to Heaton Road junction with Parsonage Road.

We have revised the scheme, and the bus stop will now be retained in its existing location.

You said signage warning of cyclists is required on Bridges.

We will implement a signage strategy as the design is developed in more detail.

You said you’re against signalised junction on Heaton Road / Ashburn Road / Alexandra Road.

We have revised the scheme, and the proposed signal junction has been omitted and replaced with a priority junction, including a raised table and uncontrolled pedestrian dropped crossings.

You said pavement parking needs to be stopped.

We have proposed bollards at some specific key locations throughout the scheme extents, to prevent pavement parking. Unfortunately, if there are no physical measures preventing pavement parking and there are no parking restrictions in place (i.e. a double or single yellow line); then Stockport Council does not have the powers to enforce, irrespective of whether the vehicle is parked on or off the pavement. In this case, if the vehicles are considered to be parked in a dangerous position and causing safety issues for other road users this should be reported to the Police. This is then at the discretion of the Police to decide whether a vehicle is deemed to be parked in a dangerous position and causing an obstruction.

You said that proposals are seemingly prioritising cyclists over motorists.

Our objective for this scheme is to encourage more walking, cycling and use of public transport to help reduce car use, to reduce congestion and to lower pollution. In some instances, this will involve reallocating road space currently used by motor vehicles to cyclists.  Where this happens account will be taken of the needs of motor traffic, for example, to ensure that HGV’s can still safely complete manoeuvres at junctions and that essential loading requirements are accounted for.

You requested 20mph be implemented on Mauldeth Road.

Mauldeth Road at its closest is approx. 1.4km from the A6 and as such traffic management measures on Mauldeth Road are beyond the scope of the project.

You requested for a 24hr Bus Lane.

We are unable to change the hours of operation of the bus lanes currently as it is outside the scope of the consultation. Also, any alteration to the current restrictions would need to be considered for the whole route (Stockport and Manchester) at a GM level and would be subject to further consultation and legal process.

You said you’re against shared pedestrian/cyclist spaces.

We have proposed shared pedestrian/cyclist spaces where segregated cycle paths cannot be provided due to limited space. The extents of such shared space are kept to the minimum needed to serve, for example, a Toucan crossing.

You said bus lanes should not be extended.

We have proposed bus lane extensions as they will connect the existing bus lanes to help improve bus journeys by:

• Helping to increase the number of people travelling by bus and thus reducing the amount of car journeys and encouraging more active travel.
• Helping to improve bus journey times on the A6 between Manchester and Stockport.
• Helping to improve the reliability of buses on the A6 between Manchester and Stockport.
• Helping to improve connections with other modes of transport by improving the reliability and bus journey times.

You said the A6 should be made more pedestrian / cycle friendly.

Proposals for this scheme include: 

  • Raised tables at junctions with side roads, including footway improvements and uncontrolled pedestrian crossings.
  • Widened footways
  • Puffin crossings for pedestrians.
  • Toucan crossings with shared use cycle/footways.
  • Local segregated cycleways.
  • Wayfinding signage.

We have also proposed two alternative cycling routes which use the existing network and are designed to provide a safer route by avoiding busy main roads where possible, whilst still trying to have a comparatively direct route. The proposed routes also provide connections to local schools, residential areas, and other local amenities.

You said you think that cyclists may not use the proposed cycle routes.

 

We have proposed two alternative cycling routes which use the existing network and are designed to provide a safer route by avoiding busy main roads where possible, whilst still trying to have a comparatively direct route. The proposed routes also provide connections to local schools, residential areas, and other local amenities.  The scheme will be subject to activation measures when completed and future usage will be monitored.

 

You said all roads leading off the A6 should be one-way.

One way streets increase vehicle mileage and can increase vehicle speeds on local streets, hence they are only used were considered essential.  We are not currently proposing to introduce new one-way roads off the A6.

You said you’re against the potential loss of parking.

We are conscious of the need to maintain parking where it can safely be accommodated without detriment to safety, operation, and the needs of vulnerable road users. We have sought to maintain that balance but, in some locations, on-street parking provisions will be removed.  Where this occurs, it will be minimised to that necessary to achieve the aims and objectives of the project.

GM Transport Policy places the needs of pedestrians and cyclists above the need to provide for the parking of private motor vehicles.

You said the Glenfield Road Traffic signals are unnecessary.

We have proposed this crossing to serve pedestrians and cyclists crossing Warwick Rd or Glenfield Rd at the junction itself. The current crossing on the A6 south of the junction is not as direct or convenient for this purpose.

We have carried out a survey and the requirement for a signalised junction with shared pedestrian and cycling facilities has been assessed and the proposal is deemed suitable. The signals will also help vehicles access the A6 from the side roads.

You said you’re against cyclists being encouraged to use Leegate Road.

Currently, Leegate Road is accessible to cyclists and helps connect to the existing network. We are proposing to use the existing network along with a combination of off-road paths and quiet roads which are already linked to the wider cycle network, to create an alternate route to using the A6.

Our aim is to help encourage people to become more active and make fewer car journeys to reduce traffic congestion and air pollution and to help tackle climate change. Part of this is to make it easier and more attractive for residents to make journeys on foot or by bike.

You requested for maintenance on Leegate Road.

We have proposed to improve the existing surface of Leegate Road, subject to agreement with the landowners (as it is a private road).

You said you’re against raised junction tables.

We have proposed raised junction tables to benefit all road users, including cyclists and pedestrians. We have found raised junction tables work well as a traffic calming measure to help reduce the speed of traffic as well as improving pedestrian crossings.

You said opening up the gateway between the adopted and unadopted parts of Leegate Road could allow access for motorcyclists.

We have not proposed any access controls other than bollards at 1.5m spacing as those that prevent motorcycle use also prevent access for mobility aids such as disability scooters.

You said the western cycle route should go through Heaton Moor Golf Course.

We have considered adapting the existing PROW for pedestrians which crosses the course for cycle use but there were safety concerns associated with a cycle path on the same route. As Heaton Moor Golf Club is privately owned, any proposals are subject to agreement with the landowner.

You said you’re against cycle route along St James Road.

The cycle markings have been omitted from the scheme.

You said the contra-flow cycle lane needs physical segregation.

Physical segregation at the entrance to the road will be considered when the scheme is subjected to detailed design. Signage and road markings will also be used to inform both drivers and cyclists. Where we propose this, there will also generally be proposals to introduce a 20mph speed limit.

You said you’re against changing the priority of traffic on Broomfield Road / Warwick Road.

We have revised the proposed cycle route and the change in priority has been omitted.

You said that you’re concerned about the safety of the public in shared spaces.

In the past, we have schemes involving shared spaces that have proved safe in operation and the future schemes will be subject to a Road Safety Audit and will be monitored in case any safety issues arise. We are only proposing shared spaces where segregated cycle paths cannot be provided due to limited space.

You said you’re against the crossing on Heaton Moor Road / Peel Moat Road / Broomfield Road.

This signal junction is part of a previously approved scheme that will be implemented in 2025.

You requested no access to motor traffic on Warwick Road.

It is not necessary to close off access to motor traffic on Warwick Road, to support this scheme. We have instead proposed a 3.5-tonne weight limit to facilitate the widening of the footways over the railway bridge.

Any scheme to close Warwick Rd completely to traffic would require separate consultation/approval processes.

You said there is no need for a cycle route down Heaton Road as no one cycles that way.

We have found that Heaton Road is currently used by cyclists. Part of our proposals contain a section of Heaton Road which forms part of the western cycle route, to provide an alternative route to the A6, designed to provide a safer journey by avoiding busy main roads where possible, whilst still providing comparatively direct route. The proposed route also provides connections to local schools, residential areas, and other local amenities.

You requested we add double yellow lines near the greenspace at Heaton Road / Parsonage Road junction.

Parking restrictions (No Waiting At Any Time [NWAAT] / double yellow lines) were not included in the consultation. Any proposed parking restrictions will be subject to an additional consultation process at a later date. NWAAT Traffic Regulation Orders (TRO) at this location will be considered.

You asked for segregated cycle lanes running down the A6.

Unfortunately, we are unable to provide segregated cycle lanes running down the A6 as:

1) The project is primarily aimed at the improvement of bus services and facilities on the A6.  As such removal of the current bus lanes to provide segregated cycle facilities was not feasible.

2) Between Crossley Road and Manchester Road, the road corridor is too narrow.

3)Between Manchester Road and Heaton Road the corridor is wider.  However, at busy junctions where a right turn lane is required, at bus stops and in locations where parking is allowed, third-party land would need to be acquired to allow for the provision of a segregated cycleway, which is beyond the scope of this scheme. 

4) A single two-way cycle track was considered but was ultimately deemed unsafe due to possible conflicts at junctions.

5) At signal junctions, provisions would need to be made for ‘CYCLOPS’ type arrangements.  These have been investigated but, in all cases, would need land beyond the Highway boundary to provide them, which is beyond the scope of this scheme.

For the above reasons, the provision of segregated cycleways along the A6 is beyond the budget or timetable. Scheme development, approval, TRO and CPO processes would take the scheme well beyond the March 2027 deadline for completion and the budget would need to be increased to accommodate more changes to kerb lines, statutory undertakers apparatus diversions and land acquisition.

Overview

Improving Journeys – A6 Corridor in Stockport

Introduction:

Stockport Council is consulting over improving journeys on the A6 corridor from the Manchester Boundary to Stockport Town Centre.

Working in partnership with Transport for Greater Manchester (TfGM), we want to make the roads safer, reduce bus journey times, improve access to bus stops, provide better crossings, and develop cycle routes parallel and across the A6 to make it easier to walk, wheel and cycle.

A scheme has been developed jointly with TfGM, and a public consultation is being held from Monday 26th February to Sunday 24th March.

Overview Drawing

Your browser does not support inline PDF viewing. Please download the PDF.

(Full-screen Image Link)

Proposed Works:

There are four main parts of the proposed improvements:

1. The A6 Bus Corridor - From Crossley Road in the north to Heaton Road to the south we are looking at new bus lanes, improved junctions, enhanced crossings and better bus stops. 

2. The Western Cycle Route – An improved route for cycling from Buckingham Road in Heaton Moor to Mersey Square in the Town Centre along with a better connection from the A6 to Mauldeth Road.

3. The Eastern Cycle Route - Enhanced quiet road signed quiet road and off-carriageway route from Nelstrop Road North (which connects to the Fallowfield Loop) to the Town Centre near Redrock.

4. 20mph Residential Streets - Lots of residential streets to get new 20mph speed limits to make them safer for walking, wheeling, cycling and playing out.

Drop-in Events:

  • Heaton Moor Market, Shaw Road, Heaton Moor.

       Sunday, March 3rd from 10am until 2pm

  • Heaton Sports Club, Green Lane, Heaton Moor, SK4 2NF.

        Wednesday, March 6 from 2pm until 8pm

  • Heaton Chapel Community Centre, Broadstone Hall Road S, Heaton Chapel, SK4 5JD.

        Tuesday, March 12 from 2pm until 8pm

If you would like a paper copy or you need support completing the survey please contact: 0161 474 2299 (voicemail only) or Email: a6corridor@stockport.gov.uk

Summary of Proposed Changes

Your browser does not support inline PDF viewing. Please download the PDF.

(Full-screen Image Link)

Western Cycle Route:

  1. Mauldeth Road to Shaw Road
    • Leegate Road (Private Road). Access improvement for cycles with surface improvements and possible traffic calming.
    • Leegate Road / Sevenoaks Avenue / Shaw Road. Cycling facilities on quiet carriageways including raised junctions and improved pedestrian crossing points.
  1. St James Road to Peel Moat Road
    • St James Road / Peel Moat Road. Cycling facilities on quiet carriageways including raised junctions and improved pedestrian crossing points.
  2. Buckingham Road to A6
    • Segregated pedestrian and cycling facilities on Buckingham Road Railway bridge.
    • Buckingham Road. Cycling facilities on quiet carriageways including raised junctions and improved pedestrian crossing points.
    • Buckingham Road. Proposed one-way on Buckingham Road between Chandos Road and A6 Wellington Road North with no entry for vehicles from the A6.
  1. Heaton Moor Road / Peel Moat Road / Broomfield Road junction
    • Previously approved signalised junction with pedestrian crossing facilities.
  1. Heaton Moor Road to Derby Road
    • Broomfield Road / Warwick Road / Derby Road. Cycling facilities on quiet carriageways including raised junctions, road humps and improved pedestrian crossing points.
    • Broomfield Road. Change of junction priority at Warwick Road.
  1. Heaton Road to Ashburn Road
    • Heaton Road junction with Parsonage Road. Road closure to traffic between Derby Road and Heaton Road, north of the green.
    • Heaton Road junction with Ashburn Road and Alexandra Road. Signalised junction with pedestrian facilities and relocation of a southbound bus stop to Parsonage Road.
    • Heaton Road / Ashburn Road. Cycling facilities on quiet carriageways, uncontrolled pedestrian crossings, raised junctions and road humps.
  1. Bowerfold Lane to George’s Road
    • Bowerfold Lane. Change of junction priority at Ashburn Road, cycling facilities on quiet carriageways, improved pedestrian crossings, raised junction tables, and road hump.
    • Bowerfold Lane and existing bridleway to Higher Bury Street. Upgrading of current paths to provide segregated cycle and pedestrian routes. This will involve vegetation removal, including trees, and replacement planting.
    • Higher Bury Street / Lower Bury Street. Shared footway/cycleway, junction improvements, and improved pedestrian crossings.
  1. Lower Bury Street to Travis Brow
    • Travis Brow junction with George’s Road. Improvements to the existing signalized junction to include an upgrade from Toucan facilities to a Sparrow crossing with segregated pedestrian and cycling facilities.
    • Separate signalisation of the left turn from Travis Brow to George’s Road for more efficient junction operation.
  1. George’s Road to Heaton Lane Roundabout
    • Travis Brow. Upgrade the existing Toucan crossing to a Sparrow crossing with segregated pedestrian and cycling facilities along Travis Brow to Heaton Lane.
    • Heaton Lane roundabout / Heaton Lane. Provide Tiger crossings with segregated pedestrian and cycling facilities on Travis Brow, Great Egerton Street, and Heaton Lane arms.
    • Cyclists to use existing footway/cycleway or join carriageway on Heaton Lane and use existing Toucan crossings at the A6 to access Mersey Square.

 

A6 Wellington Road North:

The Proposed New A6 Bus Lanes:

Northbound

  • Extension to the existing bus lane to the north of Weybrook Road towards Crossley Road.  

Southbound

  • New bus lane from south of Crossley Road to Manchester Road.
  • New bus lane from Wingate Road to Sparthfield Road.
  1. A6 / Crossley Road junction
    • Improvements to the existing signalised junction to bring pedestrian crossings up to current standards including widened crossings and removal of pedestrian guard-rail.
  2. A6 / Weybrook Road junction
    • Retain existing Toucan Crossing and shared pedestrian and cycling facilities.
  3. A6 / Milwain Drive / Alford Road junctions
    • Retain existing Toucan Crossing and shared pedestrian and cycling facilities.
  4. A6 / Manchester Road junction
    • Improvements to the existing signalised junction to include Toucan crossing facilities for pedestrians and cyclists with associated cycle links, realignment of the junction for safety and amendments to the parking bays.
    • Public realm improvements including a new green area and possible gateway public art feature.
    • Option 1 with a parking bay on the A6 and shared pedestrian and cycle routes or Option 2 with an additional crossing of the A6 north of Manchester Road and a segregated cycle link from the A6 to Manchester Road.
  5. A6 / Cambridge Road / Heathfield Avenue junction
    • An approved Toucan crossing and shared pedestrian and cycling facilities funded by the ‘CRSTS Streets for All’ Heaton Chapel scheme.
  6. A6 / Heaton Moor Road / School Lane junction
    • Approved junction improvements and crossing facilities funded by the ‘CRSTS Streets for All’ Heaton Chapel scheme.
  7. A6 / Brackley Road / Lawton Road junctions
    • Relocate and upgrade the existing Puffin crossing to a Toucan crossing with shared pedestrian and cycling facilities for improved cross link connections to Brackley Road and Lawton Road and onwards to the western and eastern cycle routes.
  8. A6 / Warwick Road / Glenfield Road junction
    • New signalised junction to replace the existing pedestrian crossing south of the junction. It will provide an improved west – east cycling connection between Warwick Road and Glenfield Road, make it safer to get out of the side roads and includes pedestrian crossing facilities on all arms
  1. A6 / Heaton Road junction
    • Improvements to the existing signalised junction and footways to accommodate the proposed southbound bus lane.
  2. A6 / Belmont Street
    • Approved Toucan Crossing with shared walking and cycling facilities to be built as part of an approved Lidl development.

 

Eastern Cycle Route:

  1. Nelstrop Road North to Nelstrop Road
    • Nelstrop Road North / Marbury Road / Carnforth Road / Nelstrop Road. Cycling facilities on quiet carriageways including raised junctions and improved pedestrian crossing points.
    • Road closure to traffic on Carnforth Road between Marbury Road and Broadstone Hall Road North, using bollards, tree planting and a segregated cycleway. Drop bollards will allow emergency vehicular access.
    • Change of junction priority at the junction of Nelstrop Road and Carnforth Road.
    • Bus stop upgrades and bus stop relocation.
  1. School Lane / Broadstone Road / Nelstrop Road / Downham Road junction
    • An approved Toucan crossing and shared pedestrian and cycling facilities funded by the ‘CRSTS Streets for All’ Heaton Chapel scheme.
  2. Halesden Road to Downham Road & Ash Grove
    • Downham Road / Halesden Road / Bollington Road. Cycling facilities on quiet carriageways including raised junctions and improved pedestrian crossing points.
    • Ash Grove. Segregated Contra-flow Cycleway along Ash Grove, adjacent to Manchester Road Park.
  1. Manchester Road / Lambs Fold / Halesden Road junction
    • Proposed Toucan crossing with shared pedestrian and cycling facilities for improved connections to Halesden Road and Lambs Fold through to Brackley Road. The proposed scheme will include adjustments to the car park at Lambs Fold and widening of existing path.
  1. Brackley Road to Derby Road
    • Brackley Road / St Leonard’s Road / Denby Lane / Gower Road / Glenfield Road / Warwick Road. Cycling facilities on quiet carriageways, uncontrolled pedestrian crossings, raised junction tables and road humps.
    • Denby Lane. Width restriction located west of Manchester Road.
    • Warwick Road widened footway on railway bridge and possible weight restrictions.
  1. Manchester Road – Halesden Road to Lloyd Street
    • Proposed shared pedestrian and cycling facilities from Halesden Road to north of Denby Lane.
    • Parking retained outside 239-281 Manchester Road.
    • Proposed Toucan crossing north of the junction with Denby Lane with shared pedestrian and cycling link to Denby Lane.
    • Proposed segregated pedestrian and cycling facilities from south of Denby Lane to north of Whitehill Street West.
    • Improvements to the existing signalised junction at Manchester Road and Whitehill Street West to include Toucan crossing with shared facilities for pedestrians and cyclists.
    • Proposed segregated pedestrian and cycling facilities from south of Whitehill Street West to north of Lloyd Street.
  1. Lloyd Street to Grafton Street
    • Lloyd Street / All Saints Road / Grafton Street / Bardsley Street. Cycling facilities on quiet carriageways, uncontrolled pedestrian crossings and road humps.
    • A short section of the segregated cycleway is proposed at the junction of Lloyd Street and All Saints Road with northbound contra-flow cycling allowed towards Manchester Road.
  1. Belmont Way / Grafton Street / Belmont Street junction
    • Retain existing Toucan Crossing and shared pedestrian and cycling facilities.
  2. Belmont Street to Orphanage Street
    • Belmont Street / Baker Street / Short Street / Mendip Close / Quantock Close / Gordon Street / Orphanage Street. Cycling facilities on quiet carriageways, including improved pedestrian crossings and road humps.
    • Proposed path widening to create a segregated footway and cycleway to link between Mendip Close and Quantock Close.
  1. Lancashire Hill
    • The route crosses Lancashire Hill at the existing Pegasus Crossing and follow the segregated pedestrian and cycling facilities on Lancashire Hill to the junction with Knightsbridge. The route crosses Knightsbridge on the existing Toucan Crossing and connects via Tiviot Dale towards Redrock and Merseyway Shopping Centre.

 

Proposed 20mph Speed Limits

A 20mph speed limit is proposed on residential streets throughout the areas of the Eastern and Western Cycle routes.

 

What happens next

The feedback we receive will help to gage public opinion on the City Region Sustainable Transport Settlement (CRSTS) A6 Bus Radials proposals.

Events

  • Heaton Moor Market, Sunday the 3rd of March

    From 3 Mar 2024 at 10:00 to 3 Mar 2024 at 14:00

    An in person public consultation event we be held on the 3rd of March (Sunday) at Heaton Moor Market.
    It will begin at 10am and will end at 2pm.
    Address: Heaton Moor Market, Shaw Road, Heaton Moor

  • Heaton Sports Club, Wednesday the 6th of March

    From 6 Mar 2024 at 14:00 to 6 Mar 2024 at 20:00

    An in person public consultation event we be held on the 6th of March (Wednesday) at Heaton Sports Club.
    It will begin at 2pm and will end at 8pm.
    Address: Heaton Sports Club, Green Lane, Heaton Moor, SK4 2NF

  • Heaton Chapel Community Centre, Tuesday the 12th of March

    From 12 Mar 2024 at 14:00 to 12 Mar 2024 at 20:00

    An in person public consultation event we be held on the 12th of March (Tuesday) at Heaton Chapel Community Centre.
    It will begin at 10am and will end at 2pm.
    Address: Heaton Chapel Community Centre, Broadstone Hall Rd S, Heaton Chapel, SK4 5JD

Areas

  • All Areas

Interests

  • Stockport Council Activities
  • Highways