The crossing is to be connected to Shield Street by an existing pedestrian and cycle route which links to Daw Bank.
This will require vehicles turning in and out of Gradwell Street to stop and give way to cyclists.
This includes the provision of a continuous pavement across Bowdon Street to improve access for pedestrians and cyclists is proposed. Existing resident parking bays will be retained.
To enable the closure of Bengal Street, the existing closure on Moseley Street would be removed and there would be a proportion of existing parking bays relocated from Bengal Street to the reopened Moseley Street.
This would be subject to agreement with Network Rail.
This includes the provision of a wide pedestrian crossing point and a separate cycle crossing.